Backwater valve subsidies: what exists on the South Shore
Since 1 October 2026 Québec has paid up to $700 for installing a new backwater valve, wherever you live. Three South Shore towns also have a program — but the two cannot be combined. Here is who pays what, on what conditions, and the steps to follow, in order, to get the aid.
Updated
The short version
Two kinds of aid can reduce the cost of a backwater valve on the South Shore: the provincial Rénoclimat – Adaptation program, open to everyone, and three municipal programs. None reimburses an installation done without a permit or by an unlicensed contractor, and the provincial aid cannot be combined with municipal aid: you have to choose. Read “The steps to get the subsidy” before ordering anything.
- Québec (Rénoclimat – Adaptation): up to $700 for installing a backwater valve, wherever the home is. Work done from 1 October 2026; replacing an existing valve is not eligible.
- Contrecœur: 50% of the cost, up to $500, for single-family homes built before 1 January 2000.
- Varennes: $100 through the 2026 Habitation durable program, for existing homes.
- Châteauguay: up to $500 for the main valve, and up to $1,000 for a battery-backed submersible pump, for buildings built before 2008.
- Elsewhere on this territory we found no municipal program as of 16 October 2026 — but several towns make the valve mandatory.
Rénoclimat – Adaptation: the provincial program
The Government of Québec is committing $425 million over five years to a new component of the Rénoclimat program, devoted to adapting homes to flooding, in force since 1 October 2026. It funds exactly the work that protects a basement: backwater valve, battery-backed sump pump, removable flood barrier.
That is a real change for the South Shore. Until now an owner in Boucherville, Longueuil or Brossard who wanted protection paid the full cost: the city requires the valve without funding it. The program’s “simplified path”, the one covering the valve, requires neither a diagnostic nor a flood zone: it applies wherever the home is.
The terms are now published, in the participant guide and on the program’s “Nouveautés” page, updated on 13 October 2026. Three points change what we knew. For a valve the aid is $700 at most — the “$700 to $1,000” range in the June announcement covers all simple work, not the valve alone. The energy evaluation before the work, required by the old component, “is no longer mandatory”. And Québec’s aid cannot be added to a town’s, or to a tax credit.
The online portal where you file the application is not open yet: the government announces its launch “during the fall”, and you can sign up on the program page to be told by email. You can still do the work now: the page asks owners to keep their supporting documents until then. Questions: Rénoclimat customer service, 1 866 266-0008.
- Backwater valve: up to $700, or the actual cost before taxes if lower. One valve or several, but the aid does not exceed $700 whatever the number.
- Installation only: “replacing a backwater valve is not eligible”. The valve must be new and certified, normally closed or normally open, and comply with your municipality’s requirements.
- Other simple work: battery-backed sump pump, up to $1,000; removable flood barrier, up to $800.
- Eligible home: principal residence (not a cottage or second home), house, duplex, triplex or building of four units or more, built and lived in for at least five years.
- Work done after 1 October 2026 by a contractor holding the appropriate RBQ licence; work done by the owners themselves is excluded.
- Apply within 12 months of the end of the work, and before 31 March 2029; the aid is paid by cheque, while the budget lasts.
- In a recognised flood zone only (the “accompanied path”): a diagnostic up to $1,000, then up to 75% of costs, maximum $35,000. Combined maximum: $38,500 per dwelling.
Municipally: three towns subsidise
We serve 26 municipalities. Three of them publish aid covering backwater valves. Elsewhere the pattern is consistent: the town makes the device mandatory by by-law but does not fund its installation.
Contrecœur reimburses 50% of the purchase and installation cost, taxes included, up to $500 per building, under by-law 1339-2024. Conditions: a single-family home built before 1 January 2000, connected to the City’s sanitary sewer and not used commercially — multi-unit buildings and condos are excluded; installation by a plumber holding an RBQ licence; all permits obtained beforehand; application filed within 12 months of the end of the work, one per building. Attach: proof of ownership, a copy of the permit, the plumber’s itemised invoice and a declaration signed by the plumber. Applications are handled in the order received, while funds last, and permit fees are not reimbursed.
Varennes grants $100 under its 2026 Habitation durable program (eco-action “I install a backwater valve”). The valve must be fitted by a qualified plumber; you provide the invoice and before-and-after photos. The aid does not apply to new homes and can be granted for work done up to two years earlier; if a permit is needed, apply for it before the work (Service de l’urbanisme, 450 652-9888, ext. 1300). The City also tops up certain provincial grants, Rénoclimat among them, by 25% for applications made by 31 December 2026 — but its form targets an improved EnerGuide rating and does not mention the Adaptation component: ask the City before counting on it.
Châteauguay runs its « Programme de mise en conformité des dispositifs de protection contre les refoulements d’égout et les infiltrations d’eau », created by by-law G-089-26. It reimburses all eligible costs, taxes included, up to $500 for the normally open valve on the main collector, $500 for additional valves, $750 for a submersible pump and $1,000 for a submersible pump with a backup battery. It covers residential buildings built before 2008, condos included, with no tax arrears, for work done between 1 January 2024 and 30 September 2029. In a single-family home the work must include the main-collector valve if there is not one already. The contractor must hold the RBQ plumbing licence and be a CMMTQ member. The budget is $100,000, paid in the order applications arrive until it runs out.
One rule applies to all three programs: the Rénoclimat guide forbids combining its aid with a municipality’s. For a valve, compare before you choose — in Châteauguay, for example, the City reimburses the full cost up to $500 for work done since 2024, whereas Rénoclimat pays up to $700, but only for a new installation done after 1 October 2026.
Longueuil — Vieux-Longueuil, Saint-Hubert and Greenfield Park included — does not subsidise the valve. Its own heavy-rain resilience strategy (March 2025) explains that the rules of the Rénovation Québec program exclude “almost all measures for resilience to heavy rain, including the installation of backwater valves”, and that the City is asking Québec to change them. If you live in Saint-Hubert or Greenfield Park, note too that these are boroughs of Longueuil: Longueuil’s by-law is the one that applies to you.
- Contrecœur — 50% of the cost, up to $500: single-family pre-2000, RBQ-licensed plumber, permit before the work, application within 12 months.
- Varennes — $100: plumber’s invoice and before/after photos, not for new homes, retroactive up to two years.
- Châteauguay — up to $500 per valve, $1,000 for a pump with a battery: buildings pre-2008, City permit, RBQ and CMMTQ contractor, online form.
- Longueuil (with Saint-Hubert and Greenfield Park) — no municipal subsidy; the City confirms it itself.
- Everywhere: municipal aid cannot be combined with Rénoclimat – Adaptation.
The steps to get the subsidy
The order of the steps matters as much as the work itself. An application is almost always lost on a step taken too late — a permit applied for afterwards, photos never taken, a lump-sum invoice, an attestation the contractor never signed — not on a badly fitted valve. Here is the order to follow, from the first call to the cheque.
1. Check your town’s rule
The by-law says where the valve goes and which types are banned. In Boucherville no valve may go on the main collector; in Châteauguay, on the contrary, the program requires one in a single-family home. The insertion valve is refused in Boucherville, Longueuil, La Prairie and Carignan. Rénoclimat also requires an installation that meets municipal requirements: a non-compliant installation is not eligible anywhere.
2. Check that your home is eligible
For Rénoclimat: a principal residence, built and lived in for at least five years, and a valve installed where there was none — replacing an existing valve is not eligible. For municipal aid: the year of construction (before 2000 in Contrecœur, before 2008 in Châteauguay), the type of building and no unpaid taxes.
3. Choose ONE program: Québec or your town
The Rénoclimat guide forbids combining it with municipal aid. Compare the amount, the accepted work dates and the conditions: in Contrecœur the City reimburses 50% up to $500; Rénoclimat pays up to $700 for a new installation done after 1 October 2026. If in doubt, call Rénoclimat at 1 866 266-0008 and your town’s planning department before signing.
4. Get an itemised quote from a licensed contractor
Ask for the RBQ licence number with the subclass matching plumbing work, a quote separating the part from the labour, and the valve model, new and certified. Châteauguay also requires the contractor to be a CMMTQ member. Work done by the owners themselves is not eligible for Rénoclimat.
5. Get the municipal permit before starting
Contrecœur and Châteauguay ask for a copy of the permit with the application; Varennes asks you to check, before the work, whether one is needed. Elsewhere, call the planning department. An installation done without a permit can be refused however sound it is.
6. Do the work and document it
Photos before, during and after: the spot before the work, the valve in place, its certification label and the access hatch. Rénoclimat, Varennes and Châteauguay ask for photos.
7. Have the contractor fill in the forms
Rénoclimat: the work compliance attestation form, completed and signed by the contractor personally. Contrecœur: the contractor’s declaration attached to the City’s form. Châteauguay: the compliance attestation and the valve’s watertightness attestation. Ask for them on the day of the work, not three months later.
8. Gather the supporting documents
Itemised invoice, proof of payment, a copy of the permit, photos, and proof of ownership: the tax bill or property assessment notice for Rénoclimat, the notarial deed or tax statement in Contrecœur.
9. Apply on time
Rénoclimat: through the online portal, announced to open this fall, no later than 12 months after the end of the work; you will enter your social insurance number, and the aid is paid by cheque. Contrecœur: by email to the Service de l’urbanisme, within 12 months of the end of the work. Varennes: the Habitation durable form by email or mail, paid within 120 days. Châteauguay: the City’s online form.
10. Tell your insurer, then service the valve every year
A valve can be a condition of, or improve, your sewer-backup coverage: send the invoice to your insurer. Keep the valve accessible: several by-laws require yearly maintenance by the owner.
What your plumber must provide you
Programs funding this kind of work almost always require the same thing: proof that a licensed contractor did the job to standard. That is where many applications fail, for want of documents in the right form.
In Québec every plumbing contractor must hold a Régie du bâtiment licence as soon as work is entrusted to someone other than the owner-occupant. We hold RBQ licence 5825-6405-01 and are CMMTQ members.
- An itemised quote and then invoice, separating the part from the labour — a lump sum is often refused.
- Proof of payment: Châteauguay pays the aid on presentation of the invoices and proof of payment.
- The contractor’s RBQ licence number, and CMMTQ membership where required.
- The valve model and its certification, and evidence the installation meets current standards.
- Photos of the work, before and after.
- For Rénoclimat, the work compliance attestation form, completed and signed by the contractor personally.
- In Contrecœur, a declaration signed by the plumber, attached to the form.
- In Châteauguay, a compliance attestation from a CMMTQ member and the valve’s watertightness attestation (date, make, model, diameter, direction of installation, test result).
What your town requires, even without paying
Where there is no money there are still obligations — and they differ sharply from town to town. The rules below were read in each town’s by-law or official page. A municipality missing from this list is not a municipality that requires nothing: we simply could not read its rule at source.
Boucherville requires the valve “whatever the year of construction of the building” (article 37 of by-law 2015-232). Longueuil also imposes it on existing buildings since its by-law CO-2021-1141 came into force (articles 100 to 109), on every secondary branch in the basement, and bans insertion valves.
La Prairie requires, under article 26 of its construction by-law 1248, protection devices — valves, check valves, a submersible pump as the case may be — for every building connected to the sanitary network, new or existing, and bans insertion valves. Since the June 2020 amendment (article 28), a sump pit with a pump is required for new buildings and for existing buildings whose basement is below street level, which had until 28 January 2022 to comply.
The practical conclusion: never assume your neighbour’s rule is yours. Check with your own town before buying anything.
- Boucherville — mandatory whatever the year of construction; insertion valves and outdoor installations banned; maintenance “at least every year” (by-law 2015-232, art. 37).
- Longueuil, Saint-Hubert and Greenfield Park — mandatory for existing buildings too; a valve on every secondary branch in the basement and on storm drains running through it; insertion valve banned (by-law CO-2021-1141, arts. 100 to 109).
- Brossard — valve required on every horizontal branch in the basement; metal or PVC (by-law REG-485, arts. 64 to 70).
- Carignan — mandatory whatever the year of construction; no valve on the main collector; insertion valve banned; access hatch and yearly maintenance (by-law 245 (2024)-1, art. 11).
- Candiac — mandatory wherever a sanitary sewer exists, on every drainage branch; installation and maintenance are the owner’s responsibility (by-law 5003-003).
- La Prairie — protection devices required, new or existing; pump required for new buildings and basements below street level (by-law 1248, arts. 26 to 28).
- Saint-Basile-le-Grand — check valves required, none on the main collector (by-law U-240, art. 24).
- Saint-Lambert — a closed-type valve on every secondary horizontal branch in the basement, none on the main collector (construction by-law).
- Beloeil — mandatory “since 1961”, according to the City.
- Sainte-Catherine — “every construction” must have valves (construction by-law 2011-00, art. 31).
- Saint-Philippe — a check valve to be installed and maintained at the expense of any owner connected to the sewer (by-law 449, art. 3.2.1).
- Sainte-Julie — offers nothing, and its claims page points to the “mandatory check valves”.
Mandatory since when? The question has no date for an answer
It is the question we get most often, and the answer is surprising: there is no date from which every basement in Québec had to be equipped. Québec’s Construction Code, Chapter III — Plumbing, governs backflow protection at article 2.4.6.4, but it does not apply retroactively. A building put up earlier does not have to be upgraded merely because the Code changed.
What triggers the obligation is therefore not the calendar but the work. As soon as you touch the drainage system — a basement bathroom, a relocated drain, a rebuilt installation — the part concerned must meet the Code in force when the work is done.
And a municipality may go further than the Code. Boucherville, Carignan and Longueuil do: their by-laws also cover existing buildings, which turns a conditional requirement into a general one across their whole territory. That is why you always check your own town’s rule before concluding you are compliant.
The Code itself is unambiguous about which fixtures to protect: sanitary fixtures, retention pits, sumps and running traps located below the level of the street adjacent to the building must have a backwater valve on their drain pipe where that pipe connects to a main collector subject to backflow.
What makes an installation ineligible — and costs you the subsidy
An assistance program reimburses a compliant installation. Not one that works: one that complies. That distinction decides your application, and it turns on technical details a homeowner has no reason to know in advance.
There are three types of valve — normally closed, normally open, and the insertion or “squeeze-in” type. They are not interchangeable, and the Code explicitly forbids certain arrangements. A normally closed valve cannot go on a main collector or sewer connection: it would block the airflow the sewer has to keep. A normally open one can, but only where that collector serves a single dwelling.
Be careful: that allowance in the Code is not the rule everywhere. A municipality may forbid what the Code permits, and Boucherville does — article 37 b) of its by-law 2015-232 rules out a valve of either the “normally closed” or the “normally open” type on the building’s main collector connection and on sewer connections. Both types, not just one. Fitting a device that is perfectly Code-compliant can therefore be enough to put you in breach of the by-law — and outside the program.
The squeeze-in is the commonest trap. Chapter III does not ban it, which makes it look like a safe choice — but several municipalities refuse it: Boucherville, Longueuil, La Prairie and Carignan among them. A part that is perfectly legal elsewhere makes the installation non-compliant there, and therefore ineligible.
One last point, the one forgotten once the work is done: the valve must stay accessible for use, maintenance, repair and cleaning. That is not a recommendation but article 2.1.3.2. 1) of Chapter III — and Québec’s Safety Code puts the duty of maintaining that access on the owner. Closing a valve in behind drywall while renovating puts you in default yourself.
- Normally closed valve: forbidden on a main collector or sewer connection. CSA certification required.
- Normally open valve on a main collector: allowed only where the collector serves a single dwelling. CSA certification required.
- Insertion (squeeze-in) valve: allowed by the Code, refused by several towns including Boucherville, Longueuil, La Prairie and Carignan. NQ 3632-670 certification required.
- Access to the valve: required, and required to be maintained over time — the owner answers for that.
- Maintenance: in Boucherville, article 37 h) requires servicing “at least every year”, by the owner. A valve fitted and forgotten is not a compliant valve.
- Stormwater: article 37 c) also covers garage ramp, exterior entrance and foundation drains that run inside the building — not only wastewater.
- Possible saving: several fixtures on one floor served by the same branch can be protected by a single valve fitted on that branch.
What about your insurance?
The subsidy is not the only gain. According to the Insurance Bureau of Canada, “most standard policies do not cover damage caused by sewer and drain backup”: you need an optional endorsement, and “some insurers offer incentives for installing backwater valves and/or sump pumps”.
CAA-Québec adds that some insurers “require a backflow prevention system to be installed after a loss as a condition of renewing the policy”. Before the work, ask your insurer what a valve changes to your coverage; afterwards, send them the invoice.
And on the town’s side, a missing or poorly maintained valve can let it decline liability after a backup: Sainte-Julie, Candiac, Saint-Philippe and La Prairie say so in black and white.
Verify before committing the expense
The amounts and conditions on this page were re-read at source — the Rénoclimat official page and participant guide, and each municipality’s by-law or form — on 16 October 2026. These programs are revised, enhanced or closed without notice, several stop when their budget runs out, and a stale figure on a web page gives you no recourse.
Always confirm two things before ordering the part: that the program is open when you do the work, and that your situation meets the criteria. The links below lead to the official sources.
If you are unsure what applies where you live, call us. We know the requirements of the municipalities we serve, and we can tell you what to ask your town before going further.