Skip to main content

La Vallée-du-Richelieu RCM

Plumber in Mont-Saint-Hilaire

Need a repair or planning plumbing work in Mont-Saint-Hilaire? Share what you need and the service address to discuss next steps with our Boucherville-based company.

Plomberie Boucherville does not have an office in Mont-Saint-Hilaire. We travel there from Boucherville.

Mont-Saint-Hilaire hosts the treatment plant that handles wastewater from four Vallée-du-Richelieu municipalities, including its own.

The network feeding it is unusual: the water does not simply flow downhill, it is lifted by a series of pumping stations on both banks of the river. A pressurised network behaves differently from a gravity one during heavy rain.

For an owner the consequence is simple: the backwater valve and the foundation drain are the basement's last line of defence. Since by-law 1361, adopted by council on 4 November 2024, that is no longer just a matter of prudence. Whatever the year of construction, every building served by the municipal sewer must have as many backwater valves as it takes to prevent a backup, and existing buildings have one year from the by-law’s coming into force to comply.

The by-law does not stop at the valve. It asks owners to check their backwater device every year, requires a valve on the discharge line of any sump pump, and calls for enough water-hammer arrestors to protect the house against pressure surges coming from the City’s water main.

Finally, this is a town of houses. According to CMM territorial portraits, 64% of occupied dwellings were single-detached houses in 2016, and close to 82% of households owned their home. These obligations therefore fall mostly on homeowners, with no condo board to handle them on their behalf.

Worth knowing in Mont-Saint-Hilaire

  • The Vallée-du-Richelieu treatment plant is here

    The Régie d’assainissement des eaux usées de la Vallée du Richelieu treats wastewater from Beloeil, Mont-Saint-Hilaire, Otterburn Park and McMasterville. Its administrative building and plant are at 300 rue Brunet in Mont-Saint-Hilaire.

    Source: RAEVR — Assainissement des eaux usées
  • Sixteen pumping stations on both banks of the Richelieu

    Sixteen pumping stations belonging to the Régie are in service, “mainly located on either side of the Richelieu River”, and carry wastewater to the treatment plant. It is a lifted network, not a purely gravity-fed one — which makes individual basement protection all the more useful.

    Source: RAEVR — Infrastructures de collecte et de transport
  • By-law 1361: a backwater valve is mandatory, whatever the year

    Article 11 is categorical: whatever the year of construction, the owner of any building served by a municipal sanitary, storm or combined sewer must install as many backwater valves as required to prevent any backup. An existing building has one year from the coming into force to comply. Under article 1, the by-law also exists to release the City from liability when it is not complied with.

    Source: Ville de Mont-Saint-Hilaire — Règlement 1361, articles 1 et 11
  • Where valves go, and which ones are banned

    Valves must protect the horizontal branches receiving water from every fixture — floor drains, sump pits, foundation drains, tanks, traps — installed below the level of the street manhole covers. Installing one on the main building drain is prohibited, and squeeze-in valves are banned. Article 12 requires them to stay easy to reach at all times, for maintenance and cleaning.

    Source: Ville de Mont-Saint-Hilaire — Règlement 1361, articles 11 et 12
  • Sump: a valve on the pump, and yearly maintenance

    An owner with a sump must be protected by a backwater valve on the sump pump’s discharge line. The sump and the pump must be accessible at all times, the pump must be serviced every year, and the backwater device must also be checked annually.

    Source: Ville de Mont-Saint-Hilaire — Règlement 1361, articles 11 et 12
  • Arrestors against water hammer

    Article 13 requires every building served by the municipal water main to have enough arrestors to protect it and its contents against water hammer coming from the City’s network. Water hammer is the pressure shock that makes pipes bang when the flow stops abruptly; over time it wears out fittings and appliances.

    Source: Ville de Mont-Saint-Hilaire — Règlement 1361, article 13
  • Downspouts: at least 2 m from the foundation

    Roof water must be released onto a permeable surface, and the downspout must extend at least 2 m from the foundation wall (article 14). Connecting a gutter or downspout to the foundation drain is prohibited at all times (article 15).

    Source: Ville de Mont-Saint-Hilaire — Règlement 1361, articles 14 et 15
  • A town of single-detached houses and owners

    CMM territorial portraits count 7,499 occupied private dwellings in Mont-Saint-Hilaire in 2016, 64% of them single-detached houses and 26% apartments in buildings under five storeys; 81.9% of households owned their home. Between 2015 and 2020 the town averaged 57 housing starts a year, 21 of them single-detached houses.

    Source: CMM — Portraits territoriaux (Recensement 2016 ; SCHL, mises en chantier 2015-2020)

Financial assistance in Mont-Saint-Hilaire

Since 1 October 2026 the adaptation component of the provincial Rénoclimat program covers backwater valves and battery-backed sump pumps, whatever the municipality — the battery is part of the condition, and a pump without one does not qualify. No municipal program is listed here for this city: the guide below covers what exists across the South Shore. Amounts and conditions change, so verify at the source before committing to work.

All available financial assistance

Frequently asked questions in Mont-Saint-Hilaire

Is the treatment plant in Mont-Saint-Hilaire?
Yes, at 300 rue Brunet. The Régie d'assainissement des eaux usées de la Vallée du Richelieu treats wastewater there for four municipalities: Beloeil, Mont-Saint-Hilaire, Otterburn Park and McMasterville.
Why are pumping stations mentioned here?
Because the network is not purely gravity-fed. Sixteen pumping stations belonging to the Régie are in service, “mainly located on either side of the Richelieu River”, lifting the water to the treatment plant. A lifted network behaves differently from a gravity one during heavy rain.
Is a backwater valve mandatory in Mont-Saint-Hilaire?
Yes. By-law 1361 requires one, whatever the year of construction, in every building served by the municipal sewer, with one year for existing buildings to comply. It bans squeeze-in valves, requires a valve on the sump pump’s discharge line and asks owners to check the device every year. Without compliance, the by-law releases the City from liability.
Do you serve Mont-Saint-Hilaire from Boucherville?
Yes, along with neighbouring Beloeil and Otterburn Park. Emergency service runs 24 hours a day, 7 days a week, at 514-475-5516.

Need a plumber in Mont-Saint-Hilaire?

Call us for an emergency, or request a quote for planned work.

Nearby municipalities

28 service areas in total. View service areas