In Saint-Basile-le-Grand the valve requirement comes not from a sewer by-law but from construction by-law U-240, which makes it easy to miss if you look in the wrong place.

The by-law is also stricter than average on one technical point: it forbids installing the valve directly in a floor drain's outlet pipe, and forbids putting one on the building drain.

That is the kind of detail that separates a compliant installation from one that will not be, on the day a claim is filed.

Plomberie Boucherville does not have an office in Saint-Basile-le-Grand. We travel there from Boucherville.

Worth knowing in Saint-Basile-le-Grand

  • The requirement comes from construction by-law U-240

    Article 23 sets the rule: “Wherever the sanitary sewer network exists, every building owner must install one or more backwater valves, or one or more retention valves receiving wastewater from every fixture”, naming foundation drains, catch basins, floor drains, retention pits, interceptors and basement tanks.

    Source: Ville de Saint-Basile-le-Grand — Règlement U-240, article 23
  • Never in a floor drain's outlet

    The same article dictates placement: the valve “must be installed on a secondary line. At no time may it be installed directly in the outlet pipe of a floor drain. No retention valve may be installed on a building drain.” It must also remain “easily accessible for maintenance”.

    Source: Ville de Saint-Basile-le-Grand — Règlement U-240, article 23
  • Article 24 removes the City's liability

    “Should the owner fail to install such valves and keep them in good working order, the City is not liable for damage caused to the building as a result of flooding caused by sewer backup, of any nature whatsoever.” Maintenance therefore directly conditions any recourse.

    Source: Ville de Saint-Basile-le-Grand — Règlement U-240, article 24

Frequently asked questions in Saint-Basile-le-Grand

Where is the valve requirement in Saint-Basile-le-Grand?
In construction by-law U-240, not in a sewer by-law — which is what makes it easy to miss. Article 23 requires that “wherever the sanitary sewer network exists, every building owner must install one or more backwater valves”, naming foundation drains, catch basins and floor drains.
My valve is in the floor drain: is that right?
No. Article 23 is explicit: the valve “must be installed on a secondary line. At no time may it be installed directly in the outlet pipe of a floor drain”, and no valve may be placed on a building drain.
What happens if I do not maintain my valve?
You lose your recourse. Article 24 states that “should the owner fail to install such valves and keep them in good working order, the City is not liable for damage caused to the building as a result of flooding caused by sewer backup”.
Must the valve stay accessible?
Yes, the by-law requires it to be “easily accessible for maintenance”. A valve closed behind basement finishing or set in a slab cannot be checked — and inaccessibility is itself a non-compliance.

Need a plumber in Saint-Basile-le-Grand?

Call us for an emergency, or request a quote for planned work.

Nearby municipalities

28 municipalities served in total. View service areas

Call nowGet a quote